permit period. The actual disturbance area for Mine Areas 2 and 3 (34.7 <br /> acres) is considerably less than the baseline soil survey area ( 103.6 <br /> acres) . <br /> The actual map unit areas presented in Tables 9-3-2, 9-3-3, and 9-4-3 <br /> were reexamined. Some discrepancies were identified in previous Table <br /> 9-3-2 ( i .e. , Map Unit 13) . Appropriate corrections have been made to <br /> revised Table 9-3-2 and additional Table 9-3-3. <br /> Comment 5. <br /> RESPONSE: <br /> The proposed topsoil stockpile locations shown on Exhibit 9-3, Topsoil <br /> Balance Plan, will be identified by number 9 (new shop/facilities area) , <br /> 10 (Mine Areas 2/3, west site) , 11 (Mine Areas 2/3 , east site) , and 12 <br /> (Mine Area 5) . The new topsoil stockpile identification numbers are <br /> included on revised Exhibit 9-3 (Topsoil Balance Plan) . <br /> Comment 6. <br /> RESPONSE: <br /> The eastern proposed topsoil salvage area shown on Exhibit 9-3, Topsoil <br /> Balance Plan, is a corridor which corresponds to the coal haulage ramp <br /> identified on Exhibit 12-1, Operations Plan. <br /> The western proposed topsoil salvage area is included as a grading <br /> buffer zone associated with spoil pile reduction and final grading <br /> immediately north of this reclamation block. Spoil piles currently <br /> exist within 30 feet of this topsoiled reclamation area. The grading <br /> equipment (dozers , scrapers , front-end loaders) may require additional <br /> room to maneuver. Therefore, this topsoil will be salvaged if space <br /> limitations are evident or if there is even a remote chance for topsoil <br /> contamination. <br /> Comment 7. <br /> RESPONSE: <br /> The proposed topsoil salvage areas located directly north and northeast <br /> of the pits in Mine Area 1 (see Exhibit 9-3, Topsoil Balance Plan) are <br /> 14 <br />