My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-11_PERMIT FILE - M2012004 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012004
>
2012-04-11_PERMIT FILE - M2012004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:13 PM
Creation date
4/17/2012 3:23:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
PERMIT FILE
Doc Date
4/11/2012
Doc Name
ADEQUACY RESPONSES
From
SUPERIOR OILFIELD SERVICES
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />RECLAMATION PLAN The reclamation plan is the return the site to its natural <br />condition as rangeland or agricultural use. Upon completion of mining the slopes will be <br />shaped to a maximum slope of 4:1 , topsoil will be replaced to an equivalent depth as <br />found prior to mining, approximately 6 ". The reclaimed land will be disced corrugated to <br />minimize erosion and planted to correspond to the owners wishes using a drill, either <br />wheat production or a grass mixture recommended by the Conservation Service.The <br />common mix for this area is a PBSI Native Sandyland Mix drilled at 12 lbs PLS per acre. <br />The stockpile will be stabilized using the same mix drilled at a rate of 20 lbs PLS per <br />acre and watered. No building or improvements will remain after mining. <br />The estimated cost of reclamation isi as follows. <br />623 scraper placing 6" of topsoil 8066 cu/yds @ $1.50/yd $12,099 <br />topsoil tillage and prep 10 acres @ $100 /acre $ 1,000 <br />drilling seed over 10 acres including seed & straw crimp <br />@ $175.00/ acre $ 1,750 <br />mobilization $ 2,750 <br />total reclamation costs $17,599 <br />As mining progresses the grade will be established as the mine floor and sloping will be <br />done as mining moves north. The only reclamation necessary at completion will be <br />placement of topsoil and seeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.