Laserfiche WebLink
Task description: <br />Site: Rich Pit <br />PROJECT IDENTIFICATION <br />Task #: 200 <br />Date: 4/11/2012 <br />User: TC1 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Road Reclamation <br />Basic Machine: CAT 12M <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Unit cost: $90.92 per acre <br />MOTOR GRADER WORK <br />Permit Action: S03 Bond Review Permit/Job#: M1985218 <br />State: Colorado <br />County: Pueblo <br />Agency or organization name: DRMS <br />Ripper Attachment: Multi -Shank Ripper <br />$25.31 <br />$46.66 <br />$2.31 <br />$38.49 <br />$112.77 <br />Total Fleet Cost/Hour: $112.77 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 6.13 <br />Source of estimated acreage: Exhibit L - AM -01 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: . Ripping (0 -3 mph) - 1.50 <br />Selected Blade Angle: -1 degrees <br />Effective Blade Length: 0.00 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 7.58 feet <br />Unadjusted Hourly Unit Production: 1.3782 acres/hour <br />Job Condition Correction Factors Site Altitude: 4550 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (lsh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 1.2404 acres/Hour <br />Adjusted Hourly Fleet Production: 1.2404 acres/Hour <br />Horsepower: 158 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 4.94 Hours <br />Total job cost: $557.00 <br />Abbreviation: None <br />Filename: M218 -200 <br />acres <br />CIRCES Cost Estimating Software <br />