Laserfiche WebLink
Emergency Spillway <br /> Type: Rectangular Sharp Crested Weir <br /> C = 3.27 <br /> L = 8ft <br /> Crest Elev. = 97.7 <br /> Max. Head = 0. 3 ft <br /> where C is the orifice discharge coefficient, A the area of the <br /> opening in ftZ, and Ho is the head on the orifice in feet, and Q is <br /> the discharge in cfs. The invert of the orifice is at elevation <br /> 87 . 17 and the maximum water surface during the 25yr event is 98. A <br /> standard discharge coefficient of 0.7 was used. <br /> The orifice discharges water into an 12 inch diameter pipe which <br /> terminates in the field west of the pond. In order to maintain <br /> inlet control at maximum discharge (= 1 cfs) , the outlet pipe must <br /> be at a minimum slope 0. 007 (0.7%) . Under these conditions, the <br /> pipe will be flowing nearly full. Any slope greater than this will <br /> shorten the length of pipe required and increase the discharge <br /> capacity (Simon, 1981) . <br /> The outlet works characteristics are summarized in the tables and <br /> shown in figures 2 and 3 . The discharge rating curve for the <br /> orifice can be seen in the HEC-1 run entitled 'Low-Level Outlet <br /> Performance' in the appendix 4 . The combined rating curve for the <br /> orifice and the weir is seen in the HEC-1 output entitled 'Design <br /> Storm, Full Pond and 25yr-24hr Event' , appendix 3 . <br /> 4 . West Sediment Pond <br /> Hydrology <br /> The 10yr-24hr and 25yr-24hr design events were computed and <br /> routed through the West Pond using the HEC-1 model (HEC, 1981) . The <br /> procedure is identical to that described in section 3 for the East <br /> Pond. The following table lists the watershed parameters <br /> for the 10yr and 25yr events <br /> Watershed Parameters for Westside Drainage <br /> Drainage Area = 43 .5 acres <br /> Length to Divide A� 2500 ft <br /> Curve Number = 72 <br /> Average Slope = 12.8% <br /> Lag Time = 12 . 6 minutes <br /> 7 <br />