Laserfiche WebLink
1 ■■■■ <br /> FLOOD HYDROGRAPH PACKAGE HEC-1(IBM XT 512K VERSION)-FEB 1,1985 <br /> U.S.ARMY CORPS OF ENGINEERS,THE HYDROLOGIC ENGINEERING CENTER,609 SECOND STREET,DAVIS,CA.95616 <br /> 0000 <br /> THIS HEC-1 VERSION CONTAINS ALL OPTIONS EXCEPT ECONOMICS,AND THE NUMBER OF PLANS ARE REDUCED TO 3 <br /> 1 HEC-1INPUT PAGE I <br /> LINEID.......1.......2.......3.......4.......5.......6.......7.......8.......9......10 <br /> 1 ID LOWER EAST DRAINAGE AREA FROM EAST POND TO EVEN WITH BOTTOM OF <br /> 2 ID WASTE PILE.(undisturbed A=5.6acres): IOYR-24HR EVENT <br /> 3 IT 2 300 <br /> 4 IO 3 <br /> 5 IN 120 <br /> 6 KK SW <br /> 7 BA 0.009 <br /> 8 PB 2.30 <br /> 9 PI 4 4 10 17 19 18 11 7 4 2 <br /> 10 PI 2 2 <br /> 11 IS 63 <br /> 12 UD 0.083 <br /> 13 ZZ <br /> 1 ■■■■ <br /> FLOOD HYDROORAPH PACKAGE HEC-1(IBM XT 512K VERSION)-FEB 1,1985 <br /> U.S.ARMY CORPS OF ENGINEERS,THE HYDROLOGIC ENGINEERING CENTER,609 SECOND STREET,DAVIS,CA.95616 <br /> LOWER EAST DRAINAGE AREA FROM EAST POND TO EVEN WITH BOTTOM OF <br /> WASTE PILE.(undisturbed A=5.6acres):IOYR-24HR EVENT <br /> 410 OUTPUT CONTROL VARIABLES <br /> IPRNT 3 PRINT CONTROL <br /> IPLOT 0 PLOT CONTROL <br /> QSCAL 0. HYDROGRAPH PLOT SCALE <br /> IT HYDROGRAPH TDAE DATA <br /> NMIN 2 NHNUTES IN COMPUTATION INTERVAL <br /> ]DATE 1 0 STARTING DATE <br /> IT ME 0000 STARTING TIME <br /> NQ 300 NUMBER OF HYDROGRAPH ORDINATES <br /> NDDATE 1 0 ENDING DATE <br /> NDTII1ffi 0958 ENDING TIME <br /> COMPUTATION INTERVAL .03 HOURS <br /> TOTAL TIME BASE 9.97 HOURS <br /> ENGLISH UNITS <br /> 6 KK • SW • <br />