Laserfiche WebLink
1 rrrr <br /> FLOOD HYDROGRAPH PACKAGE HEC-1(IBM XT 512K VERSION)-FEB 1,1985 <br /> U.S.ARMY CORPS OF ENGINEERS,THE HYDROLOGIC ENGINEERING CENTER,609 SECOND STREET,DAVIS,CA.95616 <br /> THIS HEC-1 VERSION CONTAINS ALL OPTIONS EXCEPT ECONOMICS,AND THE NUMBER OF PLANS ARE REDUCED TO 3 <br /> 1 HEC-1 INPUT PAGE 1 <br /> LINE ID.......1.......2.......3.......4.......5.......6.......7.......8.......9......10 <br /> 1 ID WEST DRAINAGE ABOVE MINE YARD(undisturbed): 100YR-24HR EVENT <br /> 2 IT 2 300 <br /> 3 IO 3 <br /> 4 IN 120 <br /> 5 KK WEST <br /> 6 BA 0.039 <br /> 7 PB 3.25 <br /> 8 PI 4 4 10 17 19 18 11 7 4 2 <br /> 9 PI 2 2 <br /> 10 IS 63 <br /> 11 UD 0.21 <br /> 12 ZZ <br /> 1 rrr• <br /> FLOOD HYDROGRAPH PACKAGE HEC-1(IBM XT 512K VERSION)-FEB 1,1985 <br /> U.S.ARMY CORPS OF ENGINEERS,THE HYDROLOGIC ENGINEERING CENTER,609 SECOND STREET,DAVIS,CA.95616 <br /> .rrr <br /> WEST DRAINAGE ABOVE MINE YARD(undisturbed): 100YR-24HR EVENT <br /> 310 OUTPUT CONTROL VARIABLES <br /> IRRNT 3 PRINT CONTROL <br /> IPLOT 0 PLOT CONTROL <br /> QSCAL 0. HYDROORAPH PLOT SCALE <br /> IT HYDROGRAPH TIME DATA <br /> NMIN 2 NM4UTPS IN COMPUTATION INTERVAL <br /> IDATE 1 0 STARTING DATE <br /> ITII[3 0000 STARTING TIME <br /> NQ 300 NUMBER OF HYDROGRAPH ORDINATES <br /> NDDATE 1 0 ENDING DATE <br /> NDTDa 0958 ENDING TDdE <br /> COMPUTATION INTERVAL .03 HOURS <br /> TOTAL THAE BASE 9.97 HOURS <br /> ENGLISH UNITS <br /> r►..••■■■■rr r•r srr■r••.•rrr rrr rrr•sr rrr r••rrr rrr rrr rr•rrr■rr rrr■■r■sr rrr•••...•..r.r.....•■■■rrr rr. <br /> ■■■rrrrrr••■•r <br /> 5 KK • WEST ' <br /> r•r•rrsrsr.rr• <br />