Laserfiche WebLink
List of Stipulations Resulting from this Permit Revision Approval : <br /> Stipulation No. 06: <br /> WITHIN 60 DAYS OF APPROVAL OF PERMIT REVISION (PR) NO. 2, NATIONAL KING <br /> COAL WILL SUBMIT THREE (3) SEPARATE CHEMICAL ANALYSES THAT CONFORM WITH <br /> THE MLRD 1982 GUIDELINES FOR THE COLLECTION OF BASELINE QUALITY AND <br /> OVERBURDEN GEOCHEMISTRY DATA AND ARE REPRESENTATIVE OF THE COAL TO BE <br /> MINED IN PR NO. 2 AND OF THE ASSOCIATED ROOF AND FLOOR MATERIALS. THE <br /> APPROXIMATE GEOGRAPHIC LOCATIONS OF THESE SAMPLES WILL BE INDICATED AND <br /> IDENTIFIED ON REVISED COPIES OF MAP C-10 FOR INCLUSION IN THE PERMIT <br /> PACKAGE. <br /> Stipulation No. 07: <br /> WITHIN 90 DAYS OF APPROVAL OF PERMIT REVISION (PR) NO. 2, NATIONAL KING <br /> COAL WILL SUBMIT A PLAN IN THE FORM OF A TECHNICAL REVISION TO THE PERMIT <br /> BOTH ACCEPTABLE TO THE DIVISION AND THAT PROVIDES FOR THE PERMANENT <br /> DISPOSAL OF THE COAL MINE WASTE GENERATED BY THE MINE. THE PLAN SHALL <br /> INCLUDE AN ESTIMATE OF THE AMOUNT OF COAL MINE WASTE TO BE PRODUCED AND <br /> SHALL COMPLY WITH THE APPLICABLE PORTIONS OF RULES 2.05.3(8), 2.05.3(9), <br /> 2.05.3(10), 4.10 AND 4.11 . <br /> 8491G <br />