My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-16_HYDROLOGY - C1984065 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1984065
>
2012-04-16_HYDROLOGY - C1984065 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:21 PM
Creation date
4/16/2012 9:37:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
HYDROLOGY
Doc Date
4/16/2012
Doc Name
1st Quarter 2012 Impoundment Yealry Inspection
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPOUNDMENT CAPACITIES - ACRE FEET <br />Water <br />Sediment <br />Total <br />Sediment Pond <br />6.34 <br />0.90 <br />7.24 <br />C.B. MINERALS COMPANY, LLC <br />COAL RIDGE NO. 1 MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the Coal Ridge No. 1 Mine. <br />On March 23, 2012, I performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential for failure. There was some erosion around an inlet culvert that needs <br />repaired. There were not any instability, structural weakness or other hazardous <br />conditions. There are no required monitoring procedures or instrumentation other than <br />quarterly and yearly inspections. There are no aspects which might affect stability. The <br />pond was dry. <br />Erosion repair should be complete during April. <br />The impoundment has the following capacity: <br />Note: <br />Capacities are derived from Figure 4.3 -6, Issue No. 1 dated 7/27/00 and <br />verification of sediment level relative to primary spillway. <br />To the best of my knowledge and b. ef, the impoundment has been maintained as <br />designed and in accordanceytdMIVved plan and applicable regulations. li <br />40*:+t 4:." <br />a* 1923 ' r• <br />' i <br />Ivo d (,, ' v w.' <br />Jam` 's1pver 1.`. Date <br />Coloradd' �bro 'E ngineer <br />Registration Vef 1§ 30 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.