Laserfiche WebLink
CAM Mining LLC <br />MUNGER CANYON MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the Munger Canyon Mine. <br />On March 15, 2011, 1 performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety of experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than quarterly and yearly inspections. There are no aspects <br />which might affect stability. The pond /impoundment was not discharging during the <br />inspection. The pond was dry. <br />The sediment pond has the following estimated capacity: <br />POND CAPACITY - ACRE FEET <br />Water <br />Sediment <br />Total <br />0.41 <br />0.19 <br />0.60 <br />To the best of my knowledge and belief, `' d at the Munger Canyon Mine <br />has been maintained as designed anc14 t ith the approved plan and <br />applicable regulations. � <br />e 19230 � <br />James E. St ° a °�,�� Date <br />qa QaaaQ <br />Colorado Professowll ' <br />Registration No. 19MO' <br />