Laserfiche WebLink
Page 4 of 11 <br />BULLDOZER WORK <br />Task description: Regrade Additional 16LT Road Disturbance <br />Site: Foidel Creek Mine Permit Action: MR260 Permit/Job #: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 4/12/2012 <br />User: JDM <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />MATERIAL OUANTITIES <br />Initial Volume: 3,872 <br />Swell factor: 1.250 <br />Loose volume: 4,840 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />852.6 LCY/hr <br />5% <br />6,800 feet <br />2,550 lbs/LCY <br />Earth - Dry backed <br />fill or embankment 0.9 <br />Abbreviation: None <br />Filename: CO56 -001 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$65.28 <br />NA <br />Operating Cost/Hour: <br />$102.81 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: <br />$206.58 <br />Total Fleet Cost/Hour: <br />$206.58 <br />MATERIAL OUANTITIES <br />Initial Volume: 3,872 <br />Swell factor: 1.250 <br />Loose volume: 4,840 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />852.6 LCY/hr <br />5% <br />6,800 feet <br />2,550 lbs/LCY <br />Earth - Dry backed <br />fill or embankment 0.9 <br />Abbreviation: None <br />Filename: CO56 -001 <br />CIRCES Cost Estimating Software <br />