Laserfiche WebLink
September 2, 2011 C -1981 -013 /Golden Eagle Mine DLB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 4 <br /> <br /> <br />OTHER (SPECIFY): <br /> <br />This was a partial inspection of the Golden Eagle Mine. The inspection began at the New Elk Coal Company <br />office in Trinidad with Ron Thompson. The weather at the mine site was cool and clear. No company <br />representative was present during the site inspection. <br /> <br />REVEGETATION – Rule 4.15 <br /> Vegetative Cover; Timing: <br /> <br />The NW -1 reclaimed airshaft site is well vegetated. Few weeds and very little erosion were observed. This <br />disturbance was reseeded in the fall of 2004, and has now therefore gone through 7 growing seasons (2005, 2006, <br />2007, 2008, 2009, 2010, and 2011). The site’s vegetation could therefore be sampled for Year Nine sampling <br />during the Spring/Summer of 2013. <br /> <br /> <br /> <br />Reclaimed NE -1 Airshaft <br />