Laserfiche WebLink
September 28, 201 1 C -1982 -057 /Seneca II -W Mine SLB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 5 of 5 <br /> <br />Excavation of <br />underdrain at Pond <br />016A slide repair <br />area . Material from <br />excavation is being <br />placed into Pond <br />016A <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Filling of Pond 016A : <br />Bulldozer is placing lifts, <br />compactor working on <br />previous lift <br />P ond 016A E mbankment