Laserfiche WebLink
September 20, 2011 C -1983 -059 /Terror Creek Loadout BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 3 <br /> <br /> Surfacing and Maint enance4.03.1(5) and (6)/4.03.2(5) and (6) <br /> Reclamation 4.03.1(7)/4.03.2(7): <br /> The paved haul road was in good condition. The pea gravel on the south side of the haul above the access <br />road was pulled back up repairing the rills and gullies. The rills and gullies below the access road will also be <br />repaired by pulling up the pea gravel. <br />REVEGETATION – Rule 4.15 Vegetative Cover; Timing: <br /> The weeds noted in the July 27, 2011 report, on the south facing slope between the loadout and the tracks, <br />were not treated. <br /> <br />SIGNS AND MARKERS – Rule 4.02: <br /> The mine ID sign was in place at the main entrance. <br /> <br /> <br />DOCUMENTS RECEIVED : None <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions w ere taken as a result of this inspection and none are pending. <br /> <br /> <br /> <br /> <br />