Laserfiche WebLink
Technical Revision (TR -18) <br />Environmental Protection Plan <br />T -5.5 Specific Environmental Protection Facility Monitoring /Alarms 31 <br />T -5.5.1 Arkansas River Watershed 31 <br />T -5.5.2 Eagle River Watershed 32 <br />T -5.5.3 Tenmile Creek Watershed 33 <br />T-6 Groundwater 34 <br />T -7 Surface Water 34 <br />T-8 Water Quality Monitoring Plan 35 <br />T -9 Climate and Air Quality 37 <br />T -10 Geochemical Information 37 <br />T -11 Construction Information 37 <br />T -12 Plant Growth Media and Revegetation 37 <br />T -13 Wildlife Protection 37 <br />Tables <br />Table T -1: Climax Mine Permits and Authorizations 6 <br />Table T -2: Designated and Other Chemicals at the Climax Mine 8 <br />Table T -3: Potential Contaminant Sources and EPFs at the Climax Mine 16 <br />Table T -4: Stream Classifications and Water Quality Standards 36 <br />Figures <br />Figure AM- 06 -T -01: <br />Figure AM- 06 -T -02: <br />Figure AM- 06 -T -03: <br />Figure AM- 06 -T -04: <br />Figure AM- 06 -T -05: <br />Figure AM- 06 -T -06: <br />Figure AM- 06 -T -07: <br />Water Management System Map — Sitewide Existing (2010) Water System <br />Water Management System Map — Sitewide Phase I and II Deposition <br />Water System <br />Water Management System Schematic — Existing System (2010) Flow <br />Water Management System Schematic — Phase I Deposition Flow <br />Water Management System Schematic — Phase II Deposition Flow <br />General Arrangement Mill Area Key Plan <br />General Arrangement Reagent Storage & Handling Plan & Sections <br />Appendices <br />Appendix T -A: Designated Chemicals Emergency Response Plan <br />Appendix T -B: Material Safety Data Sheets <br />Appendix T -C: Water Quality Monitoring Plan <br />Appendix T -D: Robinson Lake Operating Plan <br />Appendix T -E: Geochemical Data <br />Climax Molybdenum Company <br />Permit No. M- 1977 -493 <br />EPP Version: R2 T -ii December 2011 <br />