Laserfiche WebLink
EXHIBIT L <br />Reclamation Costs <br />Refer to the attached mine reclamation map (Exhibit F) showing the proposed gradient of all disturbed <br />slopes and the location of revegetation areas. It is anticipated that no ponds will be constructed or <br />remain on site. The anticipated average thickness of overburden is minimal. Overburden and excavated <br />soil materials unsuitable for road construction will be used to backfill excavated areas and for site re- <br />grading to stable slopes. Stockpiled topsoil will be placed on re- graded areas prior to re- seeding with <br />approved plant type seed mixes. Final site reclamation costs include the cost of native dry land grass <br />seed and mulch application. <br />(1) The estimated costs for Reclamation will include seeding and mulching. Per the County <br />Vegetation Specialist, irrigation is not required. <br />Reclamation Seed Mix: $196 /acre <br />Certified Weed -free Straw Mulch: $100 /acre <br />Total Reclamation Costs (Seed & Mulch): $296 /acre * 76± acres = $22,500 <br />(2) Please refer to Seed Quote from Pawnee Buttes Seed Inc. on the following page. <br />