Laserfiche WebLink
restored to the condition it was in prior to prospecting <br />4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />No new roads or surface disturbance will be created for access or for drilling. Drilling will occur within the prism of good quality, existing roads <br />that aarva as amass to newly logged sin - s and aIl aativltiaR will nrrty entirely nn previously dish whorl areas Nn mad repair wnrk will ha <br />necessary for access, however there may be some minor cut and fill approximately 10 to 15 feet into the slope above/below the drill pad for rig <br />stabilization at the drill site. It is not known at this time whether mud -pits will be necessary for this project, but Compass is being conservative in <br />assuming that they will be needed. If needed, the mud -pits will be used as infiltration pits for water that has become too sandy for re-use in <br />the drilling circulatory system. Any excavated or unused soil will be stockpiled during drilling then placed back into its original location and <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 2 Average Width 40.00 (ft) Average Length 80.00 (ft) <br />B. Drill Holes: Quantity 2.00 Depth 2,000.00 EA. (ft) Diameter 4.10 (in) <br />C. Mud Pits: Quantity 2.00 Average Width 18.00 (ft) Average Length 30.00 (ft) <br />Average Depth 3.00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />As stated above, mud pits may be necessary for drilling activities. The maximum size <br />of the pits will be 18ft. wide by 30ft. long by 3ft. deep and will be bermed with the soil <br />excavated from the pits. At least one end of the pits will have a gently tapered slope <br />f or safety pr ecautiur Is. <br />F. Other Disturbances (please describe): <br />None <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />It is possible that diesel fuel will be stored on site using a <200 gallon tank for the drill rig <br />and service vehicles. All other regulated chemicals (e.g. oil, lubricants, grease, etc.) will be <br />stored within various service vehicles for operations and will be brought on /off site each <br />day. <br />F. New Road(s): Length /Qom' (ft) Width (ft) <br />Significantly Upgraded Road(s) Length Al o N or (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None <br />