Laserfiche WebLink
Total acres <br />backfilled: <br />sa —�. caaaaa <br />Total acres <br />seeded w/ <br />Permittee Name: <br />Total acres <br />w /topsoil <br />Permit Number: <br />Total acres <br />mulched w/ <br />Operation Name: <br />Amick Pit <br />5 <br />approved mix: <br />0 <br />replaced: <br />0 <br />approved mulch: <br />0 <br />Total acres <br />Current Bond Amt: <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons): <br />5 <br />apvd fertilizer: <br />0 <br />depth (in.): <br />0 <br />0 <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />0 <br />method: <br />0 <br />method: <br />0 <br />According to C.R.S. 34 - 32.5 - 116 or 34 - - 116, each year, on the anniversary date of the permit, an operator shall submit <br />the annual fee, an annual report and map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since <br />NO <br />YES NO <br />12/2010 <br />YES <br />YES <br />22.75 <br />0 <br />0 <br />1/2 <br />LESS <br />5 -10 acres <br />sa —�. caaaaa <br />uqa l %%.fjtfl l <br />Permittee Name: <br />Meeker Sand & Gravel <br />Permit Number: <br />M- 1979 -103 <br />Operation Name: <br />Amick Pit <br />County: <br />Rio Blanco <br />Annual Fee Due: <br />$791 . 00 <br />Anniversary Date: <br />April 8, 2012 <br />Permit Acreage: <br />94.1 <br />Current Bond Amt: <br />$ 70, 091.00 <br />According to C.R.S. 34 - 32.5 - 116 or 34 - - 116, each year, on the anniversary date of the permit, an operator shall submit <br />the annual fee, an annual report and map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since <br />NO <br />YES NO <br />12/2010 <br />YES <br />YES <br />22.75 <br />0 <br />0 <br />1/2 <br />LESS <br />5 -10 acres <br />