Laserfiche WebLink
September 12, 2011 C -1982 -056 /Foidel Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 4 of 8 <br /> <br /> <br /> <br />GENERAL MINE PLAN COMPLANCE: <br />The longwall miner continues to operate in the 17LT panel. A coal train was in the process of loading at the time <br />of t he inspection. <br /> <br />TCC received and acknowledged receipt of NOV -2011 -005 on Monday September 12, 2011 during the inspection <br />o f the site. <br /> <br />OTHER (SPECIFY): <br />This was a complete coal inspection of the Foidel Creek Mine conducted by Jason Musick of CDRMS. Brian <br />Watterson of TCC accompanied the inspection. The weather was clear and the ground was dry during the <br />inspection. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 <br /> Drainage Control; Surf ace Stabilization; Placement: <br />Refuse material continue s to be placed in the RDA expansion area. Material has been stockpiled at the toe of the <br />RDA expansion area with grading being conducted during the inspection. The RDA was well compacted and <br />stable at the time of the inspection.