My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_INSPECTION - C1994082
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1994082
>
2011-09-16_INSPECTION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:11 PM
Creation date
4/10/2012 12:13:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Date
9/16/2011
Doc Name
Email sent to Operator attached with Inspection Report sent via Email (Coversheet)
From
DRMS
To
Roy Karo
Inspection Date
9/14/2011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 14, 2011 C -1994 -082 /Yoast Mine SLB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 6 <br /> <br /> <br />REVEGETATION – Rule 4.15 Vegetative Cover; Timing: <br /> Weed management - The 2003 shrub clump in the north pit had been retopsoiled and graded to elimina te <br />the heavy weeds in the area. Care was taken to avoid the established shrubs. The operator should monitor this <br />area and spray any weeds that emerge again. <br /> <br />The 2010 shrub plot at the base of the north pit area (adjacent to Haul Road A) and the clump at the inlet of Pond <br />012 both looked good. Several of the newly planted shrubs and trees were leafed out and looked very healthy. <br />The operator indicated that more shrubs and trees were scheduled to be planted yet this fall. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> The scarp of the Neck Pit slide had been graded to a more stable and safe configuration, as had the scarp <br />of the Pond 013 slide. Toe drains were being excavated in the Neck Pit slide area. The operator reported that toe <br />grading of the Pond 013 slide t o clear the affected postmining drainage channels had been complete, but this was <br />not field inspected due to heavy rains the second morning of the inspection. <br /> <br />The Pond 012 slide repair was complete with the exception of hydroseeding along the regraded sli de face, which <br />the Division recommended delaying until next year in the event that the slope is not yet stabilized. <br /> <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending.
The URL can be used to link to this page
Your browser does not support the video tag.