My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-21_INSPECTION - X201123102 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
X201123102
>
2011-10-21_INSPECTION - X201123102 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:14 PM
Creation date
4/10/2012 11:29:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201123102
IBM Index Class Name
Inspection
Doc Date
10/21/2011
Doc Name
Email sent to Operator attached with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Peabody Energy
Inspection Date
10/4/2011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 4, 2011 X -2011 -231 -02 /Peabody Sage Creek 2011 Exploratio n Project SLB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 2 of 4 <br /> <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y =Inspected N =Not Inspected R =Comments Noted V =Violation Issued NA =Not Applicable <br />N - Air Resource Protection <br />R - Backfill & Grading <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />N - Gen. Compliance With Mine Plan <br />NA - Other <br /> <br />N - Roads <br />N - Reclamation Success <br />R - Revegetation <br />NA - Slides and Other Damage <br />R - Signs and Markers <br />R - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial inspection of the Peabody Sage Creek Mining Company’s 2011 exploration drilling sites, limited <br />to the three h oles located along the Yoast Mine Haul Road A corridor (Hole IDs CCU072, CCU073, and CCU074). <br />No representative of Peabody Sage Creek was present during the inspection. Drilling operations at these holes <br />w ere observed by this inspector on July 18 and 19 , 2011. <br />B ACKFILL and GRADING – Rules 2.02(g) and 4.21.4(4): <br /> The CCU072, CCU073, and CCU074 drill pads and associated pits had been regraded to blend with the <br />surrounding topography. <br /> <br />HYDROLOGIC BALANCE - Rules 2.02(f), 4.21.4(7), and 4.21.4(10): <br /> Straw wattles were in place on the downgradient sides of the drill pads . <br /> <br />REVEGETATION – Rules 2.02(g) and 4.21.4(6): <br /> Each of the three sites appeared to have been seeded; grasses were germinating at each site. <br /> <br />SIGNS AND MARKERS – Rules 4.21.1 and 4.02: <br /> Ground level brass cap type hole markers with the company name, hole number, and year drilled were in <br />place along with a 4’ fence post type marker at all three inspected sites. <br /> <br />TOPSOIL – Rules 2.02(f) and 4.21.4(5): <br /> Topsoil had been red istributed at each site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.