My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-06_INSPECTION - M1980244
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980244
>
2012-04-06_INSPECTION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:56 PM
Creation date
4/9/2012 2:43:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
INSPECTION
Doc Date
4/6/2012
Doc Name
INSPECTION REPORT
From
DRMS
To
CRIPPLE CREEK & VICTOR GOLD
Inspection Date
4/3/2012
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division conducted a monitoring inspection of the site on April 3, 2012. Mr. Mark Vanoni (CC &V Sr. <br />Environmental Coordinator) was present during the inspection. The primary focus of this inspection was to observe <br />ongoing reclamation and revegetation efforts. Mr. Michael Cunningham was also present representing the DRMS. <br />Inspection: <br />Mr. Vanoni provided a field overview of the reclamation and revegetation efforts south Altman area and the <br />area between the WHEX and East Cresson. <br />The inspection continued as the Division visited each of the high and low solution collection system transducers <br />and recorded water level values. The recording sheet is included as Attachment A, and the values are <br />summarized below in the Transducer Readings. <br />The recently drilled monitoring well (CRMW -3C) is now developed. CC &V and the DRMS anticipate <br />collecting split water quality samples from the 3 monitoring wells near the end of this month. <br />The Arequa Gulch underdrains were inspected. The South Underdrain discharge was measured by Mr. Vanoni <br />to be 1.3 gpm. Both the North Underdrain and the AG /Spring were dry. The flowmeter installed for the B63 <br />pumpback line indicated a flow rate of 0.36 gpm. The A35 pumpback line was dry. No flow was observed in <br />the Arequa Gulch flume (AG 1.5 -001 A). <br />Transducer Readings: <br />Phase I High Volume Solution Collection (readings in ft) <br />Pump #299 / XDCR #xx Pump #300 / XDCR #00 <br />34.8 32.1 <br />Pump #301 / XDCR #01 Pump #302 / XDCR #02 Pump #303 / XDCR #03 <br />21.8 21.8 23.9 <br />Phase I Low Volume Solution Collection (readings in ft) <br />Pond LvI / XDCR #1 System Press / XDCR #2 <br />35.50 39.30 <br />Phase I Pond Piezometers (readings in ft) <br />Piezo #1 (HAND) Piezo #2 (AUTO) <br />0.42 0.47 <br />OBSERVATIONS <br />Phase II & III High Volume Solution Collection (readings in ft) <br />Pump / XDCR #4 Pump / XDCR #5 Pump / XDCR #6 <br />11.6 11.3 12.2 <br />Phase I1 & III Low Volume Solution Collection (readings in ft) <br />Pump / XDCR #1 (AUTO) Pump / XDCR #2 (AUTO) <br />0.26 0.34 <br />Phase II & III Pond Piezometer (readings in ft) <br />Piezo (Pipe) <br />33.10 <br />PERMIT #: M -1980 -244 <br />INSPECTOR'S INITIALS: TC1 <br />INSPECTION DATE: April 3, 2012 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.