Laserfiche WebLink
December 12 -15 , 2011 C -1981 -008 /New Horizon Mine MLT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 Page 8 of 8 <br /> <br /> Photo 5 – Soil from core placed in bag labeled with hole number and sampling interval <br /> <br /> Photo 6 – Lift B subsoil stockpiled separately from large Lift B pile