My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-06_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2012-04-06_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:56 PM
Creation date
4/6/2012 1:50:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
4/6/2012
Doc Name
1st Quarter 2012 South Taylor Fill Monirtoring Report
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />1313 Sherman St., Room 215 <br />MINING <br />Denver, Colorado 80203 <br />—&— <br />Phone: (303) 866 -3567 <br />SAFETY <br />FAX: (303) 832 -8106 <br />April 6, 2012 <br />John W. Hickenlooper <br />Governor <br />Tony Tennyson, Environmental Engineer <br />Mike King <br />Colowyo Coal Company <br />Executive Director <br />5731 State Highway 13 <br />Loretta E. Pineda <br />Meeker, CO 81641 <br />Director <br />RE: Colowyo Mine, Permit C- 1981 -019 <br />South Taylor Fill Monitoring Report, First Quarter 2012 <br />Dear Mr. Tennyson: <br />The Colorado Division of Reclamation, Mining, and Safety ( CDRMS) has reviewed and found the above referenced <br />report to be in compliance with all applicable CDRMS regulations, including the following: <br />1. 4.09. 1 (1 1)(a) — The fill was inspected for stability by a registered engineer during the placement and compaction <br />of fill materials. <br />2. 4.09(11)(b) — The qualified registered engineer provided to the Division a certified report within two weeks after <br />the inspection that the fill is being constructed as specified in the design approved by the Division. The South <br />Taylor Fill was inspected on March 13, 2012 and the Quarterly Fill Monitoring Report was received by the <br />Division on March 19, 2012. No appearances of instability, structural weakness, and other hazardous conditions <br />were noted in the inspection report. <br />3. 4.09(11)(c) — Rule 4.09(11)(c) is no longer applicable during this stage of fill construction. Colored photographs <br />of the South Taylor's Underdrain Areas were attached in the 2008 Third Quarter Fill Monitoring Report. <br />If you have any questions feel free to contact me at (303) 866 -3567, extension 8113. <br />Sincerely, <br />a- / � , "7 Z- �, <br />Robert Zuber, P.E. <br />Environmental Protection Specialist <br />Office of <br />Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.