Laserfiche WebLink
November 14, 2011 C -1980 -006 /Marr Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Numbe r of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 6 <br /> <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br />4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br />4.05.13; Drainage – Acid and Toxic Materials 4.05.8; Impoundment s 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> <br />Silt fences have been constructed on the west end of the backfilled sediment pond for sediment control. <br /> <br />Silt fences. <br /> <br />OTHER (SPECIFY): <br />The gate for Marr Mine site entrance was locked and no access to the mine site was achieved. Rob Zuber made <br />contact with Kerr Coal Company and was informed it would be fixed. <br /> <br />New disturbance at the loadout was observed east of the backfilled sediment pond due to heavy equipment needed <br />for backfilling and topsoiling. <br /> <br />Debris and trash was observed at the backfilled sediment pond of the loadout area which will need removed.