My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-20_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2011-12-20_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:20 PM
Creation date
4/5/2012 11:13:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
12/20/2011
Doc Name
Email sent to Operator with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Kathy Welt
Inspection Date
12/7/2011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 7, 2011 C -1980 -007 /West Elk Mine JRS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 11 <br /> <br />subsequent inspections. <br /> <br />ROADS – Rule 4.03 ; Co nstruction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maint enance <br />4.03.1(5) and (6)/4.03.2(5) and (6); Rec lamation 4.03.1(7)/4.03.2(7): <br />- The main access/haul road is a paved road up to the office area. The section of the road up to the Sylvester <br />Gulch facilities is a dirt/gravel road. The entire length of the road was well maintained and stable. No rutting or <br />erosional problems were noted on the dirt portion of the road. <br />- The old drill road that leads to the upper portion of the RPEE was well maintained and stable. This road is being <br />used as access for the construction of the refuse pile and buttress. No erosional problems were noted on this road. <br />Chris Nyikos indicated that this road will probably be reclaimed once the main haul road has been constructed. <br />- MCC was working on the haul road for the RPEE, which is in the RPEE slide area. See “Slides and Other <br />Damage” below for more details. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br />- MCC was working on remediation of the slide area below the pad by stacking tube 2 (ST -02). They were <br />simultaneously installing a F rench drain system and rebuilding the pad and outslopes. The contractor was moving <br />in good fill material that was previously excavated from the slide area and compacting it in shallow lifts of 12 <br />inches or less (the lifts I observed being spread and compa cted were more in the eight inch range). Once the <br />French drain is installed and the operator will reestablish the pad, which is used for stockpiling coal. Chris Nyikos <br />estimated that there was approximately 16,000 cubic yards of material that remained be fore the pad would be <br />complete. The operator was using an excavator (with approximately a five cubic yard bucket), a D6 dozer, 2 -30 <br />ton articulated trucks and an 815 compactor. <br />- MCC was also working on the RPE slide area. They have excavated the entire slide area and are placing a filter <br />blanket of 3/8” minus rock under the slide area (at the base, below all of the identified seeps) and along the slope <br />up to the top of the fill. The design called for a filter blanket that was three feet thick. MCC is b uilding a five foot <br />thick filter blanket to allow for contamination of up to one foot on the top and bottom of the blanket. The plan is <br />to intercept all of the water that comes from these seeps, allow it to flow down the filter blanket and out into a <br />syst em of ditches and probably into a sediment pond. Chris Nyikos estimated that there was approximately 45,000 <br />cubic yards of material remaining before the area would be backfilled. Once all of the material is replaced, MCC <br />will reestablish the haul road fo r the RPEE. They were simultaneously working on the filter blanket and replacing <br />the fill and on cleaning up the slide area along Highway 133. They were using two excavators and an excavator <br />with a rock breaker to do this work. They were also segregatin g larger pieces of rock to be used in the RPEE <br />buttress construction. MCC will stabilize the area then they plan on coming back into the area and finishing the <br />work this summer, as conditions permit. <br /> <br />SU PPORT FACILITIES - Rule 4.04: <br />- The main faciliti es area appeared to be well maintained and stable. The Sylvester Gulch facilities areas were also <br />inspected and found to be in good condition. <br />- The unit train loadout area was well maintained and stable at the time of the inspection. There were no probl ems <br />noted at this site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.