My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-31_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2012-01-31_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:08 PM
Creation date
4/5/2012 9:32:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
1/31/2012
Doc Name
Email sent to Operator with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
1/19/2012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 19, 2012 C -1981 -018 /Deserado Mine JRS <br /> <br /> <br />Number of Partia l Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 6 <br /> <br /> <br />GENERAL MINE PLAN COMPLANCE : <br />- The Deserado Mine has completed mining in longwall panel LWB -11 and just started mining in longwall panel <br />LWB -12. They have completed the 10 -left entries (longwall panel LWB -12 headgate) and they are almost to the <br />point along the west mains where they can start development on 11 -left (longwall panel LWB -13 headgate). <br />Mining is progressing as permitted and approved, as shown on Map 12 - B -Mine Plan. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 Drainage Control; Surf ace <br />Stabilization; Placement: <br />- The operator is currently stockpi ling refuse for the winter on the corner of refuse pile RP -5a. They will continue <br />to stockpile the refuse until conditions allow for the proper drying and compacting of the refuse (rather than it <br />freezing), which is typically late spring or early summer. The remaining pile was well graded and stable and had <br />positive drainage. <br />- Refuse Pile RP -2/3/4 was well graded and compacted at the time of the inspection. There was no water pooling <br />on the surface of the pile and it appeared to have positive drainage. This pile will be inactive during the winter <br />months and all of the refuse will be stockpiled on pile RP -5a. There were several piles of coarse material at the <br />edge of the outslope of the pile, presumable to be pushed over the outslope to fill in minor ri lling. <br /> <br />ROADS – Rule 4.03 Co nstruction 4.03.1(3)/4 .03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6) Rec lamation 4.03.1(7)/4.03.2(7): <br />- The haul road to the refuse pile was well maintained and stable a nd no erosional problems were noted. There <br />was not a problem with fugitive dust during the inspection. <br />- The mine entrance road is a paved road. This road was well maintained and stable. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />- The 10 -left vent shaft (return shaft 6) drilling is complete. The shaft has been lined and grouted. The mud pit is <br />still in place and will probably remain until it dries in late spring or early summer. At that time the mud pit will be <br />backfilled and the drill pad will be reclaimed t o the extent possible. This area was stable and no problems were <br />noted. <br /> <br />DOCUMENTS RECEIVED : None <br /> <br />This concludes the Division ’s 19 January 2012 partial inspection for the Deserado Mine. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.