My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-09_INSPECTION - C2009087 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2012-02-09_INSPECTION - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:29 PM
Creation date
4/5/2012 9:02:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
2/9/2012
Doc Name
Email sent to Operator with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Scott Cowman
Inspection Date
2/8/2012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 8, 2012 C -2009 -087 /Peabody Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Compl ete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 5 <br /> <br /> <br />Electrical Substation I nstallation Portal Area <br /> <br />OTHER (SPECIFY): <br />This was a partial coal inspection conducted by Jason Musick of CDRMS. Scott Cowman and Jen H unt of <br />Peabody Energy accompanied the inspection. The weather was cloudy and the site was wet and snow covered <br />during the inspection. Activities at the site are confined to the North Facilities Area with activities in the South <br />Facilities Area idle. <br /> <br />The following topics were discussed during the partial inspection of the site: <br />- A future meeting with DRMS personnel was discussed to address a possible future Permit Revision of the <br />Peabody Sage Creek permit to extend the permit boundary to include lands cu rrently approved within the Foidel <br />Creek Mine permit encompassing the 18LT vent shaft. <br />- The status of the Peabody Sage Creek Phase II bond release, SL -1. Currently under vegetation sampling review <br />with ESCO, the operators consultant. <br />- The possibility of a future TR to terminate the commitment of wildlife monitoring. <br />- A future TR to extend the current disturbance boundary to include a portion of land currently under Phase II <br />application. <br />- Future revisions to address as -built designs and changes to app roved ditch and culvert designs. <br /> <br />S IGNS AND MARKERS – Rule 4.02: <br />All signs and markers were in place and in compliance with the exception of the following: <br />- topsoil markers will need to be installed at the lone topsoil stockpile location. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.