Laserfiche WebLink
February 8, 2012 C -2009 -087 /Peabody Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Compl ete Inspections this Fiscal Year: 2 <br /> <br /> Page 2 of 5 <br /> <br /> <br />Inspection Topic Summa ry <br />NOTE: Y =Inspected N =Not Inspected R =Comments Noted V =Violation Issued NA =Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />NA - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hyd rologic Balance <br />R - Gen. Compliance With Mine Plan <br />R - Other <br />NA - Processing Waste <br /> <br />Y - Roads <br />N - Reclamation Success <br />N - Revegetation <br />NA - Subsidence <br />NA - Slides and Other Damage <br />Y - Support Facilities On -site <br />R - Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br />4.05.10; Diversions 4.05.4; Ef fluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br />4.05.13; Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Pond 002 (Wadge Impoundment) was holding water (iced over) and discharging at the time of the inspection. The <br />pond was stable with no problems noted. The discharge was clear. The amount of discharge was not identified <br />through the flume. <br />- Ice was observed in the float for the flow meter at the discharge. The ice should be cleared to prevent damage to <br />the float. <br /> <br />The Pecoco Pond contained water (iced over) and was discharging into the upper sump as permitted at the time of <br />the inspection. The embankments were stable and snow -covered at the time of the inspection. The primary CMP <br />spillway was in good condition and the emergency spillway was stable with no problems noted. <br /> <br />Culverts and ditches located outside of the South Facilities Area were snow -covered at the time of the inspection. <br />Ditches and culverts throug hout the site were snow -covered at the time of the inspection. All culverts were in <br />place with no problems noted. <br /> <br />The upper sump was holding water (iced over) at the time of the inspection. Water was discharging from the <br />Pecoco Pond into the upper su mp with discharge noted from the upper sump into ditch RC -D3. The embankments <br />of the upper sump were stable and snow -covered at the time of the inspection. <br /> <br />The lower sump construction has been completed. The lower sump was holding water (iced over) with discharge <br />noted. The embankments were stable and snow covered with no problems noted. <br /> <br />Portal Sump #1 and Portal Sump #2 were holding water (iced over) at the time of the inspection. a pump was