My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-09_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2012-02-09_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:29 PM
Creation date
4/5/2012 9:01:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
2/9/2012
Doc Name
Email sent to Operator with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Jerry Nettleton
Inspection Date
2/6/2012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 6, 2012 C -1982 -056 /Foidel Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection thi s Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 2 of 5 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y =Inspected N =Not Inspe cted R =Comments Noted V =Violation Issued NA =Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Complianc e With Mine Plan <br />R - Other <br />R - Processing Waste <br /> <br />R - Roads <br />N - Reclamation Success <br />N - Revegetation <br />N - Subsidence <br />N - Slides and Other Damage <br />Y - Support Facilities On -site <br />N - Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />R - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br />4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Mo nitoring 4.05.13; Surface Water Monitoring <br />4.05.13; Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Due to construction of the CRDA being completed in phases, initial perimeter ditches are constructed as <br />temporary ditches. Permanent ditches have been designed, but are not constructed due to the initial stages of <br />CRDA construction. All temporary CRDA ditches were snow -covered at the time of the inspection. No problems <br />were noted. <br /> <br />The CRDA has been d esigned with a toe -drain to prevent any significant build -up of hydrostatic pressure within <br />the pile. The toe -drain is designed to discharge into the Area #1 Pit. The Northern end of the toe -drain has been <br />covered with refuse and a small trickle of disch arge was noted at the outlet and into the Area #1 Pit. No problems <br />were noted. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.