My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-13_INSPECTION - C1980007 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2012-03-13_INSPECTION - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:07 PM
Creation date
4/4/2012 3:16:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
3/13/2012
Doc Name
Email sent to Operator with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Kathy Welt
Inspection Date
3/8/2012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 8, 2012 C -1980 -007 /West Elk Mine JRS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 4 of 8 <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2 (3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Rec lamation 4.03.1(7)/4.03.2(7): <br />- The roads around the coal stockpile areas were a bit muddy and there was some minor rutting, due to the wet <br />conditions. T he roads all appeared to be stable and no problems were noted. <br />- The road to the Sylvester Gulch facilities area was well maintained and stable at the time of the inspection. <br />- The mine entrance road is a paved road to the office building. The road was well maintained and stable. <br />- The haul road to the RPEE was muddy and there was some rutting on the lower portion of the road due to the <br />warm conditions and heavy haul trucks. There were fewer ruts and less mud on the upper portions of the haul road <br />(to wards the RPEE). The operator will need to blade this road when conditions permit. <br /> <br />SL IDES and DAMAGE - Rule 4.12: <br />- The ST -02 slide area remained stable at the time of the inspection. The slide mitigation area will be seeded this <br />spring, as condition s permit. The operator will provide a Technical Revision containing and as -built for the work <br />completed on this area. <br />- The RPEE haul road slide mitigation area remains stable. The operator cleared the dirt away from the lower <br />portion of the filter blank et placed along the repaired slope to drain the water. This will allow the water that is <br />intercepted to flow freely from the filter blanket into the ponds. The French drain that was installed also appears <br />to be working as designed. There is water flowin g from the drain into the RPE pond. The operator will provide a <br />Technical Revision containing and as -built for the work completed on this area. <br /> <br /> <br />DOCUMENTS RECEIVED : None <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.