My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-14_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2012-03-14_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:09 PM
Creation date
4/4/2012 3:07:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
3/14/2012
Doc Name
Email sent to Operator with Inspection Report sent via Email (Cover sheet)
From
DRMS
To
Jerry Nettleton
Inspection Date
3/6/2012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 6, 2012 C -1982 -056 /Foidel Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 9 <br /> <br /> <br />Pond B access road runoff to sump Sump to pond B relief ditch <br /> <br /> <br />Access road sump inlet Relief ditch to pond B inlet <br /> <br />All spillways were functioning as designed with no problems noted. <br /> <br />Ditches and culverts through out the mine site were functioning as designed. No problems were noted with the <br />exception of the following: <br />- The sump located northwest of Pond B has neared capacity in terms of sediment. This sump should be cleaned <br />when dryer conditions dictate to ensu re adequate freeboard is maintained. <br />-The culvert at the intersection of the explosives area access road was damaged at the inlet. <br />-The culvert located to the north of the ROM stockpile and behind the vent fan was ¾ ful l of sediment at the inlet. <br /> <br />GENERA L MINE PLAN COMPLANCE: <br />A longwall move has been initiated at the time of the inspection. One `120 car coal train was in the process of <br />loading at the time of the inspection. <br /> <br />Concrete pumping was being conducted at the 16LT utility borehole at the time o f the inspection. Jerry Nettleton <br />of TCC stated that the concrete pumping has been completed as o f 3/7/2012.
The URL can be used to link to this page
Your browser does not support the video tag.