My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-27_REPORT - C1980007
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2012-02-27_REPORT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:03 PM
Creation date
4/4/2012 10:02:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
2/27/2012
Doc Name
2011 Annual Reclamation Report (Emailed)
From
Kathy Welt
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2011 <br />West Elk Mine <br />Mine name <br />Address: P.O. Box 591 <br />C- 1980 -007 <br />Permit # <br />Colorado. 81434 <br />Mountain Coal Compa <br />LLC <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring <br />data as required by the approved permit. The location of the acreage reported under each land status category and <br />year of seeding (if applicable) should be clearly and accurately identified on a map included with the report. <br />Land Status Category <br />Last Years Cumulative <br />Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed <br />459.52 <br />+ <br />17.00 <br />= <br />476.52 <br />Acres backfilled and graded <br />66.05 <br />+ <br />5.11 <br />= <br />71.16 <br />Areas topsoiled <br />66.05 <br />+ <br />5.11 <br />= <br />71.16 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each <br />category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 459.52 and the total number of acres: <br />Phase I release 20.5 Phase II release NA <br />Phase III release NA <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 476.52 <br />Acreage in active mining areas 270.00 (Main Mine Site and Sylvester Gulch) <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and collector ditches, <br />water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, repair shops, and <br />parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and graded areas of refuse piles, coal mine <br />waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; and noncoal waste disposal area (garbage dumps <br />and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />This <br />Cumulative <br />10 years or <br />Greater than <br />Cumulative <br />Calendar <br />Total , <br />less <br />10 years' <br />Total <br />year <br />Acres seeded* <br />66.09 <br />+ <br />5.11 <br />= <br />71.20 <br />= <br />71.20 <br />+ <br />0 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 459.52 and the total number of acres: <br />Phase I release 20.5 Phase II release NA <br />Phase III release NA <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 476.52 <br />Acreage in active mining areas 270.00 (Main Mine Site and Sylvester Gulch) <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and collector ditches, <br />water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, repair shops, and <br />parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and graded areas of refuse piles, coal mine <br />waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; and noncoal waste disposal area (garbage dumps <br />and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.