My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-28_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2011-12-28_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:31 PM
Creation date
4/3/2012 1:03:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
12/28/2011
Doc Name
Adequacy Response (Emailed)
From
Jim Stover
To
DRMS
Type & Sequence
MR99
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Six pits will be backfilled and 0.25 miles of road will be reclaimed. <br />Fill Test Pits - Regrade Roads <br />Item <br />Pits <br />Roads <br />Quantity <br />6 <br />0.25 <br />Unit <br />Each <br />Miles <br />Eight Hours Backhoe Time for roads <br />8 <br />One Hour Backhoe Time per pit <br />75.00 <br />75.00 <br />Total direct cost <br />$450 <br />$600 <br />Job supervision hours <br />2 <br />2 <br />Job su ervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond 12.60% <br />$59 <br />$78 <br />Contract = Direct + Overhead <br />$626 <br />$796 <br />Engineering 4.25% of Contract <br />$27 <br />$34 <br />Reclamation management @6.0% of <br />Contract <br />$31 <br />$40 <br />Estimated bond <br />$684 <br />$869 <br />There is one acre of disturbance associated with this minor revision. <br />Reclaim Additional Disturbed <br />Area <br />Item <br />Seed <br />50% Re -Seed <br />Quantity <br />1 <br />0.5 <br />Unit <br />AC <br />AC <br />614.92 <br />502.32 <br />Total direct cost <br />$615 <br />$251 <br />Job supervision hours <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond 12.60% <br />$80 <br />$33 <br />Contract = Direct + Overhead <br />$812 <br />$401 <br />Engineering 4.25% of Contract <br />$35 <br />$17 <br />Reclamation management @6.0% of <br />Contract <br />$41 <br />$20 <br />Estimated bond <br />$888 <br />$438 <br />MR -99 Exhibit 28- Page 217 Revised 12/28/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.