Laserfiche WebLink
Six pits will be backfilled and 0.25 miles of road will be reclaimed. <br />Fill Test Pits - Regrade Roads <br />Item <br />Pits <br />Roads <br />Quantity <br />6 <br />0.25 <br />Unit <br />Each <br />Miles <br />Eight Hours Backhoe Time for roads <br />8 <br />One Hour Backhoe Time per pit <br />75.00 <br />75.00 <br />Total direct cost <br />$450 <br />$600 <br />Job supervision hours <br />2 <br />2 <br />Job su ervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond 12.60% <br />$59 <br />$78 <br />Contract = Direct + Overhead <br />$626 <br />$796 <br />Engineering 4.25% of Contract <br />$27 <br />$34 <br />Reclamation management @6.0% of <br />Contract <br />$31 <br />$40 <br />Estimated bond <br />$684 <br />$869 <br />There is one acre of disturbance associated with this minor revision. <br />Reclaim Additional Disturbed <br />Area <br />Item <br />Seed <br />50% Re -Seed <br />Quantity <br />1 <br />0.5 <br />Unit <br />AC <br />AC <br />614.92 <br />502.32 <br />Total direct cost <br />$615 <br />$251 <br />Job supervision hours <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond 12.60% <br />$80 <br />$33 <br />Contract = Direct + Overhead <br />$812 <br />$401 <br />Engineering 4.25% of Contract <br />$35 <br />$17 <br />Reclamation management @6.0% of <br />Contract <br />$41 <br />$20 <br />Estimated bond <br />$888 <br />$438 <br />MR -99 Exhibit 28- Page 217 Revised 12/28/11 <br />