My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-17_PERMIT FILE - X201123003 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201123003
>
2011-10-17_PERMIT FILE - X201123003 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:05 PM
Creation date
4/3/2012 12:40:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201123003
IBM Index Class Name
Permit File
Doc Date
10/17/2011
Doc Name
Email Regarding Cost Estimate
From
Jim Stark
To
Kent Gorham
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade 15 Drill Pads <br />Permit Action <br />Site: Deserado Exploration 2011 <br />PROJECT IDENTIFICATION <br />Task #: X02 State <br />Date: 17- Oct -11 County <br />User: JRS <br />Colorado <br />Rio Blanco <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat D8T - 8SU <br />310 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Notice of Intent X- <br />2011- 230 -003 <br />Permit/Job #: X201123003 <br />Abbreviation: None <br />Filename: X230 -X02 <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,500 <br />Swell factor: 1.250 <br />Loose volume: 1,875 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly <br />production: <br />Operator Estimate <br />Cat Handbook <br />70 feet <br />1,093.7 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />5,800 feet <br />2.650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Utilization % <br />Ownership Cost/Hour: <br />$58.56 <br />NA <br />Operating Cost/Hour: <br />$102.81 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,500 <br />Swell factor: 1.250 <br />Loose volume: 1,875 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly <br />production: <br />Operator Estimate <br />Cat Handbook <br />70 feet <br />1,093.7 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />5,800 feet <br />2.650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />
The URL can be used to link to this page
Your browser does not support the video tag.