Laserfiche WebLink
3 <br />(Not for DP Entry) <br />Permitted <br />Actual <br />Proposed <br />8. Mineral ownership: <br />Indicate currently permitted acreage for each <br />N/A <br />Federal: 1209 acres <br />1209 <br />40 <br />N/A <br />State: 80 acres <br />80 <br />0 <br />N/A <br />Private: 641 acres <br />641 <br />0 <br />N/A <br />Indian: 0 acres <br />0 <br />0 <br />N/A <br />9. Surface ownership: <br />Indicate currently permitted acreage for each <br />Federal: 0 acres <br />1209 <br />0 <br />N/A <br />State: 0 acres <br />80 <br />0 <br />N/A <br />Private: 9 acres <br />641 <br />9 <br />N/A <br />Indian: 0 acres <br />0 <br />0 <br />N/A <br />10. Affected area (in acres) <br />2046.15 <br />2046.15 <br />N/A <br />11. Disturbed area in acres <br />10.88 <br />10.88 <br />N/A <br />12. Acreage of area reclaimed in previous permit <br />term <br />A. Backfilled and graded <br />10.88 <br />3.14 <br />N/A <br />B. Retopsoiled <br />10.88 <br />2.05 <br />N/A <br />C. Reseeded <br />10.88 <br />2.05 <br />N/A <br />13. Acreage for which bond has been released <br />A. 60 percent <br />N/A <br />0 <br />N/A <br />B. 85 percent <br />N/A <br />0 <br />N/A <br />C. 100 percent <br />N/A <br />0 <br />N/A <br />14. Renewal Term Requested Years <br />5 <br />N/A <br />Note: If the application contains proposed (new) acreage, then a permit revision application <br />form must also be completed for those acreages. <br />15. Type of Mine (Check one): X Underground _ Surface <br />_ Combined Surface and Underground <br />Loadout Other <br />16. Current Permit Status (Check one): _ Active — Temporary Cessation <br />X Permanent Cessation (Reclamation Only) _ Suspended <br />17. Current Estimated Life of Mine (in years): 0_0 <br />