Laserfiche WebLink
Mr. Jared Dains <br />• Timnath- Connell SWSP <br />March 30, 2012 <br />Page 2 <br />control. There are approximately 8 acres of exposed ground water at the site. Gross evaporation <br />at the Timnath - Connell Pit is estimated to be approximately 39 inches /year and with an annual <br />effective precipitation amount of 0.8 feet (9.6 inches), net annual evaporation is estimated to be <br />approximately 2.4 acre -feet per acre (29 inches). For the 8.0 acres of ground water exposed at <br />this site, annual net evaporation is estimated to be 19.5 acre -feet. The total annual consumptive <br />use from evaporation and operational uses at the site is 20.3 acre -feet. <br />The lagged depletions from the Timnath - Connell Pit were estimated by the Applicant's <br />consultant using the Alluvial Water Accounting System (AWAS) stream depletion model developed <br />by the Integrated Decision Support Group with the following assumptions: <br />• Distance from the gravel pit centroid to the river (X) = 2,500 ft <br />• Alluvial aquifer width (W) = 5;300 ft <br />• Specific yield (S) = <br />• Transmissivity (T) = 50,000 (gpd /ft) <br />The stream depletion model shows that the Timnath - Connell Pit's stream depletion will equal <br />approximately 24.4 acre -feet during the approval period as shown in the attached Table 2. <br />The Applicant has continuously dewatered the Timnath - Connell Pit since 1999. Water <br />pumped for dewatering is discharged into the adjacent recharge pond. This diversion into the <br />pond is not a part of the metered Box Elder Ditch Shares that are also discharged into the <br />recharge pond. The dewatering depletions are lagged to the river using the same parameters as <br />the other lagged depletions from the Timnath - Connell Pit as described above. The dewatering <br />accretions are lagged to the river using the same parameters as the site depletions with the <br />exception of using a distance from the centroid to the river (X) of 3,000 ft. This dewatering <br />operation creates lagged accretions that mimic the lagged depletions. Thus at the cessation of <br />dewatering the only depletion that would hit the river is that which is attributable to the first fill of <br />the pit. The Applicant intends to line the pit when mining activity is complete thereby eliminating <br />the depletion caused by the first fill. Should dewatering cease prior to the pit obtaining a liner <br />approval from the Division Engineer, the Applicant must address the lagged depletions due to the <br />"first fill." <br />The SerFer Pit (DRMS M- 2008 -006, WDID 0303028, SWSP WDID 0302534) is also <br />owned by Connell Resources, Inc. and relies on the Timnath - Connell SWSP to provide <br />excess accretions to the SerFer SWSP. This must be accounted for in the Timnath - Connell <br />SWSP by showing the accretion credits as a depletion against this plan. For this approval <br />period, the total `depletion' to the Timnath - Connell Pit to be credited to the SerFer Pit is <br />6.93 acre -feet. <br />Replacements <br />The source of replacement water for this combined plan will be from 2.5 Box Elder Ditch <br />shares (WDID No. 0300926). The shares will be diverted into a recharge pit (WDID 0302596) located <br />on the Timnath - Connell site. The recharge pit was constructed in an area of the mining site that was <br />previously excavated for sand and gravel mining. The evaporation losses listed in Table 2 for the <br />Timnath - Connell Pit include the evaporation losses from the recharge pond. Connell Resources, Inc. <br />owns 4.0 shares in the Box Elder Ditch that were historically used to irrigate the property known as <br />the John Weitzel Farm, which is the site of the Timnath Connell Pit. Connell Resources also owns <br />0.5 shares of the 3.5 shares Box Elder Ditch shares that were historically used to irrigate the property <br />known as the Robert Weitzel Farm, which is now divided into two mining sites (Stute Pit and Weitzel <br />Pit). The 0.5 shares used on the Robert Weitzel property is not to be used for this plan. <br />