Laserfiche WebLink
EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -wav travel distance: <br />Average Travel Speed: <br />Total Non- Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost * *' <br />** one round trip, no haul rig: <br />Transportation Cycle Tunes <br />Haul Time (Hours): <br />Return Time (Hours) <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.29 <br />0.29 <br />0.29 <br />0.29 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.57 <br />0.57 <br />CANON CITY <br />10.00 miles <br />35.00 mph <br />$1,344.63 <br />$54.00 <br />Total job time: 3.14 Hours <br />Total job cost: S1,398.65 <br />CIRCES Cost Estimating Soft -ware <br />