Laserfiche WebLink
EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />CANON CITY <br />Total one -wav travel distance: <br />50.00 miles <br />Average Travel Speed: <br />35.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />$7763:4y <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$0.00 <br />** one round trip, no haul rig: <br />Transportation Cycle Tine' <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non- Roadable <br />Equipment <br />Roadable <br />Equipment <br />1.43 <br />1.43 <br />1.43 <br />1.43 <br />1.25 <br />NA <br />125 <br />NA <br />5.36 <br />2.86 <br />Total job timer <br />10.71 Hours <br />Total job cost: $7,763.49 <br />CIRCES Cost Estimating Soft -ware <br />