Laserfiche WebLink
Raw Coal to Stockpile <br />42" x 430 LF <br />Convevor, elevated, <br />430.00 <br />LF <br />$42.26 <br />$18,171.80 <br />Convevor <br />(E) <br />including supports - 5ft. <br />W x Eft. H housing <br />Stockpile to C &S <br />42" x 100 LF <br />Convevor, elevated, <br />100.00 <br />LF <br />$42.26 <br />$4,226.00 <br />Conveyor <br />(E) <br />including supports - 5ft. <br />W x Eft. H housing <br />C &S Transfer Belts <br />36" x 120 LF <br />Convevor, overland, <br />120.00 <br />LF <br />$16.71 <br />$2,005.20 <br />(o) <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />Radial Stacker <br />36" x 100 LF <br />Convevor, elevated, <br />100.00 <br />LF <br />$42.26 <br />$4,226.00 <br />Conveyor from C &S <br />(E) <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />Portal Apron <br />25'X20'Xl2" <br />Demo. and on -site <br />500.00 <br />SF <br />$3.22 <br />$1,610.00 <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />Remove Debris from <br />Assume 1,000 <br />Loading and 2 mile <br />1,000.00 <br />CY <br />$15.10 <br />$15,100.00 <br />Site <br />CY <br />haul, no salvage - <br />Machine loading <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 480.00 (unadjusted): $184,714.97 location);; $183,791.40 <br />CIRCES Cost Estimating Softivate <br />