Laserfiche WebLink
DEMOLITION WORK <br />Task description: Demolish and Remove All Structures <br />Site: Northfield Mine <br />PROJECT IDENTIFICATION <br />Permit Action: 2012 Bond <br />Recalculation <br />Task #: 070 State: Colorado <br />Date: 1/25/2012 County. Fremont <br />User' JRS <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Penii t /.lob #: C2006085 <br />Abbreviation: None <br />Filename: C085 -070 <br />Location adjustment: 99.50 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />Office/Bath /Warehouse <br />50'x100'x25' <br />Bldg. (MN) demo. /on- <br />125,000.00 <br />CF <br />$0.21 <br />$26,375.00 <br />site disposal in <br />excavated pit - Max. <br />10;000 ft. haul <br />- Concrete Supports <br />12M,18 "x8' <br />Demo. and on -site <br />96.00 <br />LF <br />$14.47 <br />$1,389.12 <br />disposal in excavated <br />pit, 1.5 ft. x 3 Tt. - Max. <br />200 ft. push <br />-Pad <br />50'x100'x5" <br />Demo. and on-site <br />5,000.00 <br />SF <br />$1.61 <br />$8,050.00 <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />Shop <br />50'x100'x24' <br />Bldg. (MN) demo. /on- <br />120,000.00 <br />CF <br />$0.21 <br />$25,320.00 <br />site disposal in <br />excavated pit - Max. <br />10;000 ft. haul <br />-Pad <br />50'x100'x5" <br />Demo. and on -site <br />5,000.00 <br />SF <br />$1.61 <br />$8,050.00 <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />Surface Rail <br />100 LF <br />Railroad track - Ties and <br />100.00 <br />LF <br />$8.57 <br />$857.00 <br />track <br />- Ballast (18 "Deep) <br />28 CY <br />Railroad track - Ballast <br />28.00 <br />CY <br />$4.12 <br />$115.36 <br />Mine Hoist <br />25'x25'xl5' <br />Bldg. (MN) demo. /on- <br />9,375.00 <br />CF <br />$0.21 <br />$1,978.13 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />-Pad <br />25'x25'xl6" <br />Pavement, concrete, <br />31.00 <br />CY <br />$112.00 <br />$3,472.00 <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />- Push Concrete Into <br />NA <br />CatD9T - 9SU <br />8.00 <br />EA <br />$259.36 <br />$2,074.88 <br />Fill <br />Crushing and <br />40'x40'x25' <br />Plant (3S) demo. /on -site <br />40,000.00 <br />CF <br />$0.21 <br />$8,200.00 <br />Screening Plant <br />disposal in excavated pit <br />-Max. 10.000 ft. haul <br />- Concrete Supports <br />12(x24 "x6' <br />Demo. and on -site <br />72.00 <br />LF <br />$19.30 <br />$1,389.60 <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />Truck Scale House <br />10'x15'x8' <br />Bldg. (SN) demo. /on- <br />1,200.00 <br />CF <br />$0.18 <br />$219.60 <br />site disposal in <br />excavated pit - Max. <br />10.000 ft. haul <br />CIRCES Cost Estimating Software <br />