Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.70 Minutes <br />Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />TraNTel Tune: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency; <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />TraNTel Tune: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />500.00 <br />1.00 <br />5.00 <br />6.00 <br />1204 <br />0.49 <br />Haul Time: 0.49 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />Scraper(s) <br />374.00 <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />500.00 <br />-1.00 <br />5.00 <br />4.00 <br />2763 <br />0.42 <br />Return Time: <br />Total Scraper team cN, cle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit productionihour: 450.60 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time <br />Unit cost $0.600 /LCY <br />Total jab cost: <br />0.42 <br />minutes <br />2.51 <br />minutes <br />374.00 <br />LCY/Hour <br />1 <br />Scraper(s) <br />374.00 <br />LCY/Hour <br />374.00 <br />LCY/Hour <br />0.63 Hours <br />$141.83 <br />CIRCES Cost Estimating Software <br />