Laserfiche WebLink
MOTOR GRADER WORK <br />Task description: Finish Grade Disturbed Areas <br />Permit Action: 2012 Bond <br />Site: Northfield Mine Recalculation Pennit /Job #: C2006085 <br />PROJECT IDENTIFICATION <br />Task #: 030 <br />Date: 1/25/2012 <br />User: JRS <br />State: Colorado <br />Countv: Fremont <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 12M <br />Ripper Attachment: <br />Cost Breakdown <br />Abbreviation: None <br />Filename: C085 -030 <br />Horsepower: 158 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $92.94 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 21.55 acres <br />Source of estimated acreage: Page 2.05.4 -7 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$23.48 <br />30 <br />NA <br />Operating Cost/Hour: <br />$44.99 <br />feet <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Net grading or ripping width per pass: <br />8.40 <br />Operator Cost/Hour: <br />$24.47 <br />1.5273 <br />NA <br />Total Unit Cost/Hour: <br />$92.94 <br />Altitude: 5400 feet <br />Source <br />Total Fleet Cost/Hour: $92.94 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 21.55 acres <br />Source of estimated acreage: Page 2.05.4 -7 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />10.40 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />8.40 <br />feet <br />Unadjusted Hourlv Unit Production: <br />1.5273 <br />acres /hour <br />Job Condition Correction Factors <br />Site <br />Altitude: 5400 feet <br />Source <br />Altitude Adj _ 1.00 (CAT HB) <br />Job Efficiency: 090 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.3745 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.3745 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />15.68 Hours <br />Unit cost: $67.62 per acre <br />Total job cost: <br />$1,457.00 <br />CIRCES Cost Estimating Softivare <br />