My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-25_REVISION - C2006085
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2006085
>
2012-01-25_REVISION - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:56 PM
Creation date
4/3/2012 12:25:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Revision
Doc Date
1/25/2012
Doc Name
Bond Liability Recalculation (Emailed)
From
Jim Stark
To
Janet Binns
Type & Sequence
TR1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description <br />Site: Northfield Mine <br />BULLDOZER WORK <br />ade Haul Road <br />Pen-nit Action: 2012 Bond <br />Recalculation <br />PROJECT IDENTIFICATION <br />Task #: 021 State: <br />Date: 1/25/2012 County: <br />User: JRS <br />Colorado <br />Fremont <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cast Breakdown <br />APMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Permit /Job #: C2006085 <br />Abbreviation: None <br />Filename: C085 -021 <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$72.40 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />3;500 <br />Swell factor: <br />1.165 <br />Loose volume: <br />4,078 LCY <br />Source of estimated volume: Page 2.05.3-22- ' Map 12: Division Estimate <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistencv description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 5,400 feet <br />Material weight: 2,9001'bs/LCY <br />Weight description: Decomposed rock - 50% Rock- 50% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.