My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-25_REVISION - C2006085
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2006085
>
2012-01-25_REVISION - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:56 PM
Creation date
4/3/2012 12:25:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Revision
Doc Date
1/25/2012
Doc Name
Bond Liability Recalculation (Emailed)
From
Jim Stark
To
Janet Binns
Type & Sequence
TR1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time <br />Job Condition Correction: <br />0.90 Minutes <br />0.70 Minutes <br />Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />Travel Tune: <br />Road Condition: Rutted dirt, little maintenance; no water, 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />Travel Tune: <br />Road Condition: Rutted dirt, little maintenance; no water, 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1100.00 <br />2.00 <br />4.00 <br />6.00 <br />1204 <br />1.00 <br />Haul Time: 1.00 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />Scraper(s) <br />286.93 <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />1100.00 <br />-2.00 <br />4.00 <br />2.00 <br />2898 <br />0.56 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 345.70 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.782 <br />0.56 <br />minutes <br />3.16 <br />minutes <br />286.93 <br />LCY/Hour <br />1 <br />Scraper(s) <br />286.93 <br />LCY/Hour <br />286.93 <br />LCY/Hour <br />Team(s) Total job time: 30.70 Hours <br />/LCY Total job cost: $6,891.67 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.