Laserfiche WebLink
CN-cle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Tune: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Page 73 of 114 <br />Site Altitude: 7800 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm smooth, rollin , dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />0.980 <br />NA <br />(CAT HB) <br />Job Efficiencv: <br />0.830 <br />NA <br />(CAT HB) <br />Page 73 of 114 <br />Site Altitude: 7800 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm smooth, rollin , dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />12.00 <br />3.00 <br />15.00 <br />589 <br />3.40 <br />Haul Time 3,40 minutes <br />R etnrn Route <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />-12.00 <br />3.00 <br />-9.00 <br />2192 <br />0.98 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 581.94 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />0.98 <br />minutes <br />5.98 <br />minutes <br />473.12 <br />LCY/Hour <br />2 <br />Scraper(s) <br />473.12 <br />LCY/Hour <br />946.23 <br />LCY/Hour <br />Fleet size: 2 Team(s) Total job timer 57.67 Hours <br />Unit cost: $1.743 /LCY Total job cost: $95,143.85 <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />