My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2011-11-17_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
4/3/2012 12:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
11/17/2011
Doc Name
Memo Regarding Completion of Yoast Mine & Cost Estimate
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Grade Haul Road Surface Material into Fill <br />Site: Yoast Mine <br />Page 44 of 114 <br />Pen-nit Action: Partial Phase II Bond <br />Release SL -03 Pennit /Job #: C 1994082 <br />PROJECT IDENTIFICATION <br />Task #: 024 State: Colorado <br />Date: 08- Nov -11 County: Routt <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown <br />JIPMENT COST <br />Cat D1 1R - 11U <br />850 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename C082 -024 <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 46,111 <br />Swell factor: 1.000 <br />Loose volume: 46,111 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Average push distance: 100 feet <br />Unadjusted hourly 2;870.3 LCY/hr <br />production: <br />Materials consistenev description: Drv, non - cohesive 0.8 <br />Average push gradient: 0% <br />Average site altitude: 7,800 feet <br />Material weight: 3,2501'bs/LCY <br />Weight description: Gravel - Pitnm <br />Job Condition Correction Factor Source <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$131.18 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 46,111 <br />Swell factor: 1.000 <br />Loose volume: 46,111 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Average push distance: 100 feet <br />Unadjusted hourly 2;870.3 LCY/hr <br />production: <br />Materials consistenev description: Drv, non - cohesive 0.8 <br />Average push gradient: 0% <br />Average site altitude: 7,800 feet <br />Material weight: 3,2501'bs/LCY <br />Weight description: Gravel - Pitnm <br />Job Condition Correction Factor Source <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.