Laserfiche WebLink
Operator Skill: <br />Material consistenev: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2985 <br />Adjusted unit production: 856.78 LCY /hr <br />Adjusted fleet production: 1713.56 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 2Dozer(s) <br />Unit cost: $0.519/LCY <br />Total job time: <br />Total j ob cost: <br />1.09 Hours <br />$966.57 <br />Page 21 of 114 <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />