Laserfiche WebLink
Page 7 of 114 <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibilita: <br />Job efficiency: <br />Spoil pile <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.100 <br />(CAT HB) <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.516 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />2;749.46 LCY /hr <br />5498.92 LCY /hr <br />Fleet size; 2 Dozer(s) <br />Unit cost: $0.162/LCY <br />Total job tune: 7.80 Hours <br />Total jobcost: $6,932.15 <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />