My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-02_REPORT - C1996083 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2012-04-02_REPORT - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:47 PM
Creation date
4/3/2012 11:23:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
4/2/2012
Doc Name
2011 Annual Hydrology Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2011
Permit Index Doc Type
Hydrology Report
Email Name
BFB
SB1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2011 Annual Hydrology Report <br />March 26, 2012 <br />North Fork Alluvium Monitoring Wells <br />Alluvial monitoring wells AW -1 through AW -6 are located near the mine entrance along <br />the north side of Bowie Road. These wells are monitored quarterly for field parameters <br />and semi - annually for full suite laboratory parameters during the second and fourth <br />quarters in accordance with the permit application. Alluvial monitoring wells AW -7 <br />through AW -9 are located near the mine entrance along the south side of Bowie Road. <br />AW -10 cannot be reliably sampled due to a collapse of the casing, and will be <br />eliminated from the monitoring plan. These wells were installed as a requirement of <br />PR -03 which allowed the mine operator to relocate Sediment Pond B to the south side <br />of the highway. Alluvial Wells 11 through 13 were installed during the fall of 2000 to <br />monitor the alluvium in the area where the new coal loadout (PR -06) was constructed. <br />Alluvial well 13 was eliminated by the construction of the unit train loadout. Alluvial well <br />14 was installed during 2003 west of Pond K. Alluvial wells 15 through 17 were <br />installed during the fourth quarter of 2003 and are located north of Bowie Road below <br />the coal mine waste disposal area. <br />The 2011 sampling season provides results consistent with baseline information <br />provided in the permit application, showing no adverse impact to groundwater during <br />the construction of the mine except for alluvial wells 16 and 17. These two alluvial wells <br />located south of the gob pile have conductivity values significantly higher than baseline <br />conditions. <br />Surface Water Monitoring Stations: PONDS <br />Ponds were sampled for water quality when discharging or inflows /outflows were <br />occurring. Ponds are typically spring -fed or seep -fed and exhibit diffuse non - <br />concentrated areas of inflow. Often the pond outlets present the only point of <br />concentrated flow at which flow measurements and field parameters can be obtained. <br />Where possible, quality measurements are obtained at the pond inlet. Stagnant water <br />in ponds is not sampled since water quality results would show the effects of <br />evaporation and stock use and could not be used to evaluate potential mine affects. <br />Ponds are monitored quarterly. The following information is collected for the ponds; 1) <br />inflow; 2) outflow; and 3) water level below spillway outlet or depth of water in pond <br />measured from the bottom of the pond. Field data collected during the 2011 sampling <br />season is consistent with baseline information provided in the permit application. <br />Surface Water Monitoring Stations: SPRINGS <br />Fifty nine springs were monitored during the 2011 monitoring season in accordance <br />with the Hydrologic Monitoring Plan. Five of the springs have not be monitored since <br />July 2007 because a slide made them inaccessible. This plan indicates that identified <br />springs will be inspected quarterly for field parameters with full suite laboratory <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.