Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade diversion /collection ditches <br />Permit Action: Phase II /III Bond <br />Release SL -12 and <br />Site: New Horizon Mine PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 057 <br />Date: 10/21/2011 <br />User: SLB <br />State: Colorado <br />County: Montrose <br />Abbreviation: None <br />Filename: C008 -057 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />1PMENT COST <br />Cat D3K XL - 3P <br />74 <br />Power Angle Tilt <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $0.00 <br />Total Fleet Cost/Hour: $76.57 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$11.58 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$26.51 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $0.00 <br />Total Fleet Cost/Hour: $76.57 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />12,953 <br />Swell factor: <br />1.165 <br />Loose volume: <br />15,090 LCY <br />Source of estimated volume: Length from map 2.05.3 -1, X -sec from Sec 2.05.3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />169.6 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,700 feet <br />2,9001bs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />